Single Point of Responsibility A design-build contract combines design and construction quality, cost, and schedule into a single point of responsibility. Design-build contracts foster partnering between team members, which in turn adds value to a project. This single point of responsibility also helps the design-build team avoid potential adversarial relationships that could arise under traditional, design-bid-build contracts.

Earlier knowledge of Guaranteed costs The design-build delivery system allows the contractor to establish a guaranteed cost early on in the design phase. This allows the owner to make changes, request additional value engineering, or add scope to a project before the substantial design is complete.
Master contract is between the owner and contractor
Contractor is the single point of responsibility
Owner has a single point of contact for both design and construction
Design-Build has been proven to be much quicker than Design-Bid-Build
Long lead items can be identified and ordered prior to the start of construction
Value engineering and constructability reviews are enhanced due to the integration of the design and construction process
Changes, disputes, claims and other delays occur less frequently
The contractor is responsible for the completion of construction documents
Inconsistencies or scope gaps are the responsibility of the contractor